The Health and Wellness Center Field House was completed in the Fall of 2012. The hardwood floor consists of one full-length high school court and one full-length college court. Twelve baskets surround the space with a volleyball net and two batting cages that can be lowered from the ceiling. The Field House is lined by a walking track on the upper level.
Facilities
The Golden Ram Men's Basketball team plays their home games in the Performance Gym on the Coon Rapids campus. The gym was renovated in 2012 along with the construction of the new Health and Wellness Center. The Performance Gym has hosted the MCAC/Region XIII tournament each of the past four seasons and will host again in 2015. New bleachers were installed in September of 2013.
The Health and Wellness Center Field House was completed in the Fall of 2012. The hardwood floor consists of one full-length high school court and one full-length college court. Twelve baskets surround the space with a volleyball net and two batting cages that can be lowered from the ceiling. The Field House is lined by a walking track on the upper level.
The Health and Wellness Center Field House was completed in the Fall of 2012. The hardwood floor consists of one full-length high school court and one full-length college court. Twelve baskets surround the space with a volleyball net and two batting cages that can be lowered from the ceiling. The Field House is lined by a walking track on the upper level.
Subscribe to:
Posts (Atom)
No comments:
Post a Comment